Projects
Strategic sites. Long-term performance.
A national pipeline of strategically located, development-ready data centre sites designed for long-term performance.
About Mountain xDC
We create future-ready, energy-aligned data centre sites that power Australia’s digital economy with reliability and foresight.

Building a national data centre development pipeline
Mountain xDC is developing a growing pipeline of hyperscale-ready data centre sites across Australia. Each project is selected through a disciplined, energy-led framework that prioritises power availability, planning certainty, and long-term scalability.
Our focus is on delivering development-ready sites that enable operators to move quickly, with reduced risk and clear infrastructure pathways.
Site list
- Campbells Forest Solar Farm Loddon Shire, VIC | 205 MWac
- Inverell BESS Inverell, NSW | 150 MWac / 1200MWh
- Macedon BESS Macedon, VIC | 100 MWac / 400MWh
- Yangery BESS Yangery, VIC | 120 MWac / 480MWh
- Narrogin BESS Narrogin, WA | 200 MWac / 800MWh
- Frasers Solar Farm Latrobe City, VIC | 77 MWac
- Benger Solar and BESS Hybrid Shire of Harvey, WA | 105 MWac
- West Mokoan and Kennedys Creek Solar Farms Benalla Rural City, VIC | 380 MWac
- Goorambat Solar Farm Benalla Rural City, VIC | 75 MWac

Our development pipeline
National reach, targeted delivery
Mountain xDC’s projects span high-demand digital infrastructure corridors across Australia, with a focus on metropolitan growth areas and strategically located regional hubs.
Current projects are at varying stages of development, including:
- Early-stage site identification and feasibility
- Land acquisition and planning assessment
- Energy and network alignment
- Development-ready site preparation
Details are shared with partners under appropriate confidentiality arrangements.
Project selection framework
Every Mountain xDC project is assessed against strict criteria to ensure suitability for hyperscale and enterprise deployment.
Our evaluation framework considers:
- Proximity to substations and transmission infrastructure
- Grid capacity and long-term power availability
- Access to fibre networks and data exchange corridors
- Planning permissibility and environmental considerations
- Site scale, terrain, and expansion potential
Only sites that meet our technical, energy, and planning thresholds progress into our active pipeline.


Typical project characteristics
Designed for hyperscale performance
While each site is unique, Mountain xDC projects typically feature:
- Large, flat, and contiguous land parcels
- High-density power capacity potential
- Clear zoning or favourable planning pathways
- Optional DC and BESS co-development capability
- Access to renewable energy sources
This consistency enables operators to deploy repeatable development models across multiple locations.
Project lifecycle
From opportunity to deployment readiness
Mountain xDC manages projects through a structured development lifecycle:
1. Identify: Data-driven land sourcing aligned with energy and infrastructure availability.
2. Assess: Detailed planning, environmental, and technical due diligence.
3. Enable: Early coordination with utilities, network providers, and authorities.
4. Prepare: Securing approvals and aligning infrastructure for development readiness.
5. Partnering on delivery: Confidential, collaborative engagement
Mountain xDC works closely with hyperscale operators, co-location providers, and infrastructure investors to align projects with specific technical and commercial requirements.
We engage under confidentiality to share site-level data, studies, and development timelines, ensuring transparency and alignment from the outset.

Building with responsibility
All Mountain xDC projects are developed with a strong commitment to responsible land use, energy efficiency, and community engagement. Sustainability and long-term performance guide every decision we make across our project pipeline.
